START ENGINEERING JSCo

Your partner - yesterday, today and tomorrow!

HVAC

 

Старт Инженеринг АД - ОВ и К

As part of the structure of “Start Engineering” JSC, branch “Heating Ventilation and Air Conditioning” is established as a reliable and accurate contractor for the construction of heating, ventilation and air conditioning systems of various industrial establishments, Sofia Metro, office buildings, power and transportation sites.





Our objectives

  • Branch “Heating, Ventilation and Air Conditioning” has designers’ bureau, which serves the groups located in the major economic and power energy centers in the country. The high qualification and profiling of the specialists allow for quick preparation of designs in good quality;
  • “Workshop for air ducts and ventilation elements” is equipped with high-productive and precise machines. The qualification of the personnel and the manufacturing organization allow for the trouble free provision of the sites with the required prefabricated materials;
  • The “Bureau for delivery of ventilation and air conditioning equipment”communicates with the different manufacturers and the perfect knowledge of the newest achievements in this field allow to make quick and correct deliveries, which should provide reliable and high quality operation of the systems;
  • Working groups, equipped with reliable and modern equipment perform the installation of the systems in full volume, good quality and in time;
  • “Laboratory for adjustment” to “Start Engineering” JSC is an Inspection Body of the type C authorized by the government, and the certificate, issued after adjustment and effective measurements of the parameters are valid before the different authorities for final handing over the systems.

Branch “Heating, Ventilation and Air Conditioning” to “Start Engineering” JSC has been successfully working in Russia, where it has successfully performed complete air conditioning in the bank buildings in Saratov and Serpukhov towns, and the industrial halls of a factory in Orenburg. The structure and qualification of the personnel of HVAC allowed the company to accomplish and commission ventilation and air conditioning systems of major economical, administrative and power production sites in the country, including:

 

Site

Activities

Year 

"SOPHARMA" AD

"Tablet" plant, "Ampoule" plant

-

Administrative office building of “Overgas”

Ventilation-convector system for heating and cooling of 20 000m3/h and air conditioning of adjacent parts

-

“Hilton” hotel

Ventilation systems of restaurants, bar, winter garden and adjacent parts.

-

“Radisson” hotel

Ventilation and air conditioning systems of restaurants, bar and adjacent parts.

-

“Gloria Palace” hotel

Ventilation-convector system for heating and cooling of rooms and air conditioning of restaurants, bar, winter garden and adjacent parts.

-

NEK AD

Administrative office building

of Central Dispatchers’ Management

-

"Florina-Bulgaria" AD

Administrative building and manufacturing halls in Bulgaria

-

Sofia Metro

Line 1, metro stations from №1 to №6 – adjustment

-

“Doverie” AD bank

complete air conditioning

-

“Kozloduy” NPP

Systems with high degree of air cleaning.

-

“Kremikovtzi”

Metallurgic Plant

systems for technological dust removal from the air.

-

Telegraph-Postal Building

Complete air conditioning

-

“Petrol” AD gas station

Site № 0108 – Razlog town

-

“Petrol” AD gas stations

NTI – Plovdiv town, Simeonovsko shosse, Dragitchevo village

-

“Petrol” AD gas stations

Reconstruction of the ventilation system at sites - № 0105, 0212, 7118, 7143, 4120, 4402, 5201, 7207, 1114, 0210, 4205, 4306, 4310.

-

“Fairplay” hotel

Sofia, “Shipka” str.

-

„Vita” hospital

-

-

Administrative office building “Bacho Kiro” str.

Complete ventilation

-

Administrative building

With shops, warehouses, underground garages and Transformer Station in land lot УПИ II-837, 1287, 1288, quadrant 5, Malinova Dolina area

-

Administrative building

With shops, warehouses, underground garages and Transformer Station in land lot VII 1408, 1518, quadrant 5 Malinova Dolina area - HIS Holding Building

-

Sofia metro

Line 1, metro stations from №7 to №13 – delivery, installation, starting up and adjustment.

-

Administrative building

Average urban density with underground garages, floor area = 1117,28m2, gross floor area = 4785,64m², land lot І-1560,1562, quadrant 80, “Manastirski Livadi – West” area, according to the plan of Sofia city, “Vitosha” region

-

Sofia metro

Line 2, metro stations from №5 to №11 – delivery, installation, starting-up and adjustment.

-

“Obelya” depot

Section for reparing the rolling stock (Repairing plant – Hull 3)

-

"ASAREL-MEDET" AD

Reconstruction of the existing equipment of sulphuric acid treatment plant in Mine Waters TP and Drainage Waters TP

-

Contact - Branch Hvac

1220 Sofia, Bulgaria
3 Lokomotiv Str.

Phone: +359 2 931 61 48

Fax: +359 2 931 99 65

Contact form 

Contact person:

dipl.eng. T.Boychev